Buying an older Dutch house as an international: check the energy label first
What to check before you bid
Look up the registered label and its date. Labels registered up to 2020 used an older method; phrases like 'not additionally insulated' on those labels do not tell you much about the real state of the walls or roof.
Check roof, cavity wall and crawl space in the viewing. Ask the seller what has already been insulated, and when.
Decide early whether you want to renovate before moving in. Insulation and ventilation are much easier in an empty house, and the extra borrowing space for energy saving measures is arranged at the moment you take the mortgage.
Using the purchase moment
At the purchase you can include the improvement budget in your mortgage (see the table on the mortgage page). That requires a substantiated amount. A Netzy scan based on the address gives measured areas, a route with cost ranges and the subsidy that applies, so your adviser has something to work with.
How Netzy tells you in advance what is technically feasible
Before anyone visits, we measure the roof, facade and floor areas of your specific house from the national 3D building model and public registers (BAG, EP-Online). From those areas we calculate the heat demand and, per measure, what it does to the label.
Every assumption gets a certainty percentage and a source. If a key fact is missing (year of construction, floor area or house type), we give no advice rather than filling in an average.
The order is fixed: insulate the building shell first, then install. Ventilation is decided together with the insulation, because once ducts are closed off, heat recovery ventilation is usually no longer possible.
Frequently asked questions
Can I do a scan of a house I don't own yet?
Yes. The scan works on the address, using public registers and the 3D model. It does not need access to the house, although a later inspection is always part of the final quote.
Which subsidies are there for insulation in the Netherlands?
The main national subsidy is the ISDE, paid per square metre of insulation when you do at least two measures, or one measure combined with a heat pump. Some municipalities add their own schemes. Amounts change; we calculate the current amount per measure in the scan.
More in English
- Improving your Dutch home's energy label: an English guide
- From energy label D, E or F to A: what is technically feasible
- How your energy label affects your Dutch mortgage in 2026
- Who is behind the calculation of your house
Sources
- Dutch government (Rijksoverheid / Volkshuisvesting Nederland), maximum mortgage based on energy label, amounts per 1 January 2026
- NHG (National Mortgage Guarantee), energy saving measures and NHG limit 2026
- Nationaal Warmtefonds, Energiebespaarlening conditions and rates, August 2026
- Netzy, own method and calculations, reference date 2026-09-15